Finished rooms, not staged showrooms

Recent work

Finished rooms, not staged showrooms

A selection of the work we take on week to week. If you would like to see a project close to you, ask and we will send more photographs of something similar.

Gallery

Kitchens, bathrooms and the detail in between

Every image here shows the same standard of setting out, alignment and finishing we bring to your home.

Matte black kitchen with gold handles and stone island
Kitchen installation, Bishop's StortfordSee the serviceGet a quote like this
Dark shaker kitchen units part fitted during an installation
Units going in, HarlowSee the serviceGet a quote like this
Black tiled bathroom with brushed gold fittings
Bathroom renovation, BrentwoodSee the serviceGet a quote like this
Large format black marble effect splashback tiling
Splashback tiling, EppingSee the serviceGet a quote like this
Engineered oak flooring in a bright living room
Engineered oak flooring, HoddesdonSee the serviceGet a quote like this
Freshly decorated living room with charcoal feature wall
Decoration after renovation, ChelmsfordSee the serviceGet a quote like this

The work we do

Kitchens first, then bathrooms, floors, tiling and decorating

Most of our work is kitchen installation, from Bishop's Stortford out across Hertfordshire and Essex. Bathrooms, flooring, tiling and decorating follow, often in the same house, carried out by one team from strip out to the final coat of paint. Every job starts with a survey and a free written itemised quote, runs to a day by day programme and is cleaned down at the end of each day, so the photographs here show finished rooms rather than showroom sets.

Quality

What to look for in a finished room

Setting out

Tiles should be set out from the centre line of a wall or floor, so the cuts at each end match. A thin sliver of tile in a corner is a sign the job was started at one edge and not planned.

Mitres and edges

External corners should be finished with a neat mitre or trim, not a raw tile edge or a thick line of silicone. The same goes for worktop joints and end panels, which should be scribed tight to the wall.

Level floors and units

Kitchen units should run dead level along the whole run, with doors that line up. Floors should feel solid underfoot with no hollow spots, because the subfloor was checked and levelled before anything was laid.

Clean silicone lines

Silicone around baths, trays, basins and worktops should be thin, straight and unbroken. It is the last thing fitted and the first thing people notice.

Read more on our services, the guides, or ask for a written quote.

Want a kitchen like these in your home? Ask for a quote.

Call 07929 523832Get a quote